Skip to content
LGI - Icon Renewable Energy Sites

Renewable energy

13.9 GWh generated since December 2018.
LGI - Icon Greenhouse Gas Abatement

Biogas captured

33.3 million m3
LGI - Icons -Co2 Abated

Carbon abatement

317 thousand tonnes (T CO2e abated in total)
LGI - Icons Seedlings Planted

Seedlings planted

5.2 million seedlings planted for 10 years.
As of October 2026

Biogas to Renewable Power Project

  • Long-term contract with Moreton Bay Regional Council at Bunya, Dakabin and Caboolture to recover and beneficially reuse biogas. We collaborate closely with the council, from design of the gas extraction system to completion and upgrades of the renewable project.
  • LGI designed, built, operates, maintains and monitors the biogas collection and management system and renewable power station 24 hours a day, 7 days a week to provide the best environmental outcome.
  • LGI commissioned a 1MW power station on the site in 2018 and downsized it to 600kW in 2021. Currently, a Battery Energy Storage System (BESS) with a 1MW/2MWh Tesla Megapack is being added to transform the project into a renewable hybrid.
  • Supplies consistent and dispatchable (baseload and peaking) renewable power into the local power (distribution) grid, when and where it is needed. The generator can already respond in minutes and with batteries, the project’s response will be within seconds.
  • Complements intermittent forms of renewables, like wind and solar, during high-demand periods and helps stabilise the local grid supporting regional development.
  • LGI’s Dynamic Asset Management System (DACS) integrates the battery with the power station, the landfill, the local power grid and the National Energy Market (NEM).